About Us
Established in 1989 this family owned company has earned an enviable reputation for the rapid delivery of Schedule 80
PVC & CPVC pipes, valves & fittings, as well as the design, manufacture & supply of instrumentation systems.
After many years of successful project delivery, our management team understands that our customers
choose a supplier with stock levels & supply logistics who can reliably deliver their requirements
to achieve project deadlines.
IN EVERY AUSTRALIAN STATE, WATER AUTHOURITIES RELY ON MERRIMAN FOR SAME DAY SHIPMENT OF
![]() |
TABLE D VAN STONE FLANGES & other process critical Schedule 80 PVC & |
WATER INFRASTRUCTURE PROJECTS
![]() |
Since 1989 we have been a significant supplier to many Sydney Water sites |
EXPLORATION OF MARS
![]() |
Tidbinbilla Deep Space Communication |
![]() |
WHEATSTONE & GORGON PROJECTS GAURANTEEING ENERGY SUPPLIES FOR DECADES TO COME
![]() |
We are proud to supply Chevron & DSME |
![]() |
![]() |
BAG FILTERS, BASKET STRAINERS & LINE STRAINERS. |
INSERTION PADDLE WHEEL FLOW SENSORS & FULL BORE MAGNETIC FLOW METERS
![]() |
Helping irrigators farm our golden soils, similar |
![]() |
MERRIMAN HELPING TO PROTECT OUR NATION & OUR ENVIRONMENT
HMAS Success & the ANZAC Class Frigates depend on Merriman ultrasonic level transmitters & DIR4 programmable controllers. As well as our Schedule 80 PVC piping systems to keep their Omnipure sewage treatment systems functional when operating in environmentally sensitive areas such as the Great Barrier Reef & Sydney Harbour. |
![]() |
WHEN TARONGA ZOO’s ASIAN ELEPHANTS NEED THE LOO!
THEY CAN BE SURE MERRIMAN SCHEDULE 80 PVC PIPE SYSTEMS ARE IN THE PLANT ROOM TREATING THE MESS.
PNG PROJECTS |
BOUGAINVILLE COPPER, power station operations. |
![]() |
![]() |
UK CEGB POWER STATIONS TILBURY B, RUGELEY B, PEMBROKE & DRAX A, CENTRAL ELECTRICITY REASERCH LABORATORIES. Installation & commissioning of boiler combustion controls & turbine auto run up equipment. Design of pressure & temperature control systems for the investigation of material degradation in MAGNOX nuclear power reactors. |
MERRIMAN UNDERSTAND THE PRESSURE OF PROJECT DEADLINES
OUR ENGINEERS HAVE BEEN CONSTRUCTION MANAGER ON SOME OF AUSTRALIAS MOST SIGNIFICANT PROJECTS
![]() |
REHABILITATION & REPAIR OF STEAM TURBINES. Units 3 & 4 at Vales Point Power Station. Repairs to generators at Liddell Power Station. POWER STATION CONSTRUCTION Unit 4 condenser & feed heaters at Bayswater Power Station |
![]() |
![]() |
KALGOORLIE & EASTERN GOLDFIELDS ELECTRIFICATION. One of the worlds longest single ended 220KV transmission lines from Muja power station to Kalgoorlie this project was essential to the economic development of the nickel deposits at Kambalda & the big pit at Kalgoorlie. Consisting of switchyards at Merredin & Kalgoorlie with associated transformers, static VAR compensators & filter yards. |
![]() |
BARNARD RIVER SCHEME |
![]() |
AFTER ALL THIS WORK WE THINK YOU NEED A HOLIDAY!
![]() |
CHARTER A SUPER YACHT |
IF A LUXURY RESORT IS MORE YOUR STYLE, TRY THE PACIFIC ISLANDS CLUB IN GUAM.
Merriman insertion magnetic flow meters & DIR4 programmable controllers are controlling the pumps in the
swim through aquarium
SEEMS LIKE WE HAVE DONE A LOT
BUT THEN WE HAVE BEEN IN BUSINESS A LONG TIME
TO SUCCEED FOR MORE THAN A QUARTER CENTUARY
WE NEEDED MORE THAN EMPTY PROMISES & SLICK SLOGANS
SO
WE SAY WHAT WE DO & WE DO WHAT WE SAY.
"WE DELIVER QUALITY PRODUCTS ON TIME."